![Slider 1](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/大殿選址灑淨800x533.jpg)
大殿選址灑淨 Main Hall site Selection
在2007年,達義大和尚選定現時大雄寶殿位置。
In year 2007, the Main Hall location was selected.
![Slider 2](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/奠基-Ground-breaking-ceremony.gif)
奠基 Ground-breaking ceremony
加國五台山工程於2011年5月奠基開工。工程一啟動,就得到了加中兩國政府和民間的高度讚揚,特別是各方善信的慷慨捐助,因此工程進展順利。工程有各種項目種類,是由加拿大本地和海外多家公司參與完成的。
May 28 2011 – Ground-breaking ceremony took place. The construction work was provided by crews from Canada and China, with support from both the Canadian government and the Chinese government.
![Slider 3](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/澆築大殿地基-Main-Hall-Foundation.gif)
澆築大殿地基 Main Hall Foundation
奠基後, 與兩個加拿大公司合作進行修路,澆築大殿地基等工程。
After ground-breaking ceremony, two Canadian construction companies started work on the main access roads, and the foundation of the Main Buddha Hall.
![Slider 4](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/北面水泥基礎建設-North-side-of-Main-Hall.gif)
北面水泥基礎建設 North side of Main Hall
大雄寶殿北面水泥基礎建設。
A view of the concrete structures of Main Hall north side.
![Slider 5](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/大雄寶殿未封頂前Before-top-floor-is-built.gif)
大雄寶殿未封頂前
A view before building ground floor for Main Hall.
![Slider 6](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/大殿建地面之前-Before-building-Main-Hall-floor.gif)
2013年, 在大殿建地面之前的另一個視角
In year 2013, another view from inside before building floor for the Main Hall.
![Slider 7](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/大殿基礎工程於2014年封頂.gif)
大殿基礎工程於2013年封頂
The floor for the Main Hall wa completed on 2013.
![Slider 8](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/台階和平台建設-Steps-and-platform.jpg)
大雄寶殿前台階和平台於2019年7月正如火如荼地進行中。
The steps and platform lead to Main Hall are working in progress on 2019 July.
![Slider 9](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/20190802大殿外台階1.jpg)
2019/08/02 正在施工中的通往大雄寶殿的石階梯
A view of the steel frame of the concrete steps that lead to the Main Hall on 2019/08/02.
![Slider 10](http://tbg.ecisconsulting.com/wp-content/uploads/2019/08/20190802大殿外台階3.jpg)
2019/08/02 從大雄寶殿外面平台看正在施工中的通往大雄寶殿的石階梯
A view on 2019/08/02 from the platform outside the Main Hall to the steel frame of the concrete steps that lead to the Main Hall.